Preliminary artist’s rendering of 232nd Street overpass. Click image to enlarge. |
-Two 3.5-metre lanes with a 1-metre shoulder on each side
-A shared pedestrian/cyclist lane on both sides of the overpass with a protective concrete barrier
-A vertical realignment of 75th Avenue to connect with 232nd Street at approximately 4.5 metres above existing ground level
-A guard rail for the full length of the overpass
-A width of approximately 16 metres
-Overhead lighting for the full length of the overpass
Open houses on the project will be held on:
Monday, December 5
6:00 - 9:00pm
Tuesday, December 6
6:00 - 9:00pm
Holiday Inn Express Hotel & Suites
8750 - 204 Street
Langley, BC
No comments:
Post a Comment