Monday, August 17, 2015

Amtrak service improvement coming to Metro Vancouver

Amtrak Cascade passenger rail service runs between Vancouver, BC and Eugene, Oregon. Major stops along the route include Seattle and Portland. Earlier this spring, I posted about how the US federal government pulled funding from Amtrak Cascade service.

Back in 2012, the BC, Washington State, and Oregon governments signed a Memo of Understanding to jointly manage the rail service. Not surprising, but the BC government hasn't kept up their end of the deal. Right now there are two daily round-trip trains that serve Metro Vancouver. A long-term plan for the Amtrak Cascade service, created by the Washington State Department of Transportation (WSDOT) in 2006, envisioned four daily round-trip trains for Metro Vancouver. In order to get to this point, the BC government would have needed to spend $98 to $662 million by now, and $503 to $1,067 million by 2023.

There is a range in pricing because the long-term plan notes that Amtrak Cascade service could terminate at Scott Road SkyTrian station in Surrey. This would be the most cost effective option as it wouldn’t require the replacement of the 111 year old Fraser River Rail Bridge. It would also improve access to Amtrak Cascade service for more people in Metro Vancouver.

Since the BC government isn’t even interested in solving local transit issues in Metro Vancouver, I don’t think the provincial government will help fund improvements to the Amtrak Cascade rail service in the province.

With the US federal and provincial governments' lack of support for the on-going operation of the rail service, Washington State has become the major funder of the service. Luckily, Washington State is working to grow ridership and revenue. By 2017, rail service between Portland and Vancouver will be expanded from four daily round-trip trains to six daily round trips trains. Travel times will also be reduced by about 10 minutes.

Even with the lack of provincial support, Amtrak rail service in Metro Vancouver will be improving. Right now you have to go through a two-step inspection process to be cleared for entry into the US, once at Pacific Central Station, and once at the US border. This slows down service by 10 to 20 minutes. Work has been underway to remove the border inspection by making Pacific Central Station a preclearance facility. This is similar to YVR; you clear US Customs at the airport.

In June of this year, Transport Canada, WSDOT, and Amtrak met a Pacific Central Station. Transport Canada informed WSDOT and Amtrak that the station is now ready to be a preclearance facility. It is now up to US Congress and the Canadian Parliament to official sign-off on a preclearance agreement.

It is good to see that Washington State is continuing to support passenger rail service, it is unfortunate that BC has not kept up its end of the agreement as we could have had much better passenger rail service in Metro Vancouver.

Thursday, August 13, 2015

Safety first: proposals to enhance three crosswalks and one park in the City of Langley

One of the things that I’ve been trying to advocate for in the City of Langley is for safer streets for walking and cycling. Making streets safer for people to walk or cycle will attract even more people to these modes, further enhancing safety. There is safety in numbers. Besides the health, social, and environmental benefits that comes from walking or cycling, active modes of transportation are the most cost effective ways to get around for both residents and government.

One of the ways to create safer streets is to enhance crosswalks. The City of Langley’s Public Safety Advisory Committee recently made a recommendation to improve crosswalks at three locations in the city:

  • 54 Avenue and 203 Street;
  • 54 Avenue and 204 Street; and
  • Michaud Crescent at 201 Street.

Improving these crosswalks was researched by both City of Langley and ICBC staff. This three locations are being proposed to be included in the 2016 capital budget. ICBC noted at the Public Safety Advisory Committee meeting that they will help fund improving the 54 Avenue crosswalks if City Council approves the budget for these projects.

The two 54 Avenue crosswalks currently have unlit, overhead crosswalks signs and zebra stripes. Even so, people usually blow through them when they are driving. I experience near-misses of being hit when crossing at 54 Avenue and 203 Street weekly. ICBC has recommended flash lights that can be activated when crossing plus overhead lighting.

Michaud Crescent at 201 Street is currently an unmarked crossing. Most people in BC don’t know that any intersection is a legal crosswalk. Marking the crosswalk would clarify this for people driving at Michaud and 201.

ICBC has recommended that curb extensions, narrowing the road at a crosswalks to improve visibility of people walking, should be part of enhancing all three crossing locations. Hopefully City Council will approve the budget for this, and doesn’t cheap out.

On another safety topic, Rotary Centennial Park is located behind the Fraser Crossing Mall at Fraser Highway and the Langley Bypass. The park has no viability from any street, and is very isolated.

Location of Rotary Centennial Park. Select image to enlarge.

Because there is limited visibility into the park, the park's facilities have become frequent targets of vandalism. In addition, it has become a prime location for illegal activity. Recently, the park has also become an illegal campsite. The City is looking to complete a “Crime Prevention Through Environmental Design (CPTED) Review be commissioned to identify potential immediate and long term solutions to address the current undesirable environment at Rotary Centennial Park.” It will be interesting to see the recommendations of this review which I hope that City Council will act on.

For more information about the crosswalks and proposed CPTED study, check out the latest City of Langley Council agenda.

Wednesday, August 12, 2015

Take the BC Climate Action Leadership Survey

The BC government is working towards the creation of a “Climate Leadership Plan”. This plan will supersede the earlier 2008 “Climate Action Plan” which included the carbon tax. Since the introduction of the carbon tax, the provincial government hasn’t really done much else to reduce GHG emissions or adapt to our changing climate. BC’s carbon tax was effective in reducing GHG emissions, but GHG emissions have actually started to increase again.

BC’s Historic GHG emissions, GDP and future targets. From Climate Leadership Discussion Guide. Select chart to enlarge.

Earlier this year, the province put together a “Climate Leadership Team” which includes members of the provincial government, academia, local government, environmental groups, First Nations, and resource-based businesses. They have been tasked with creating a new plan to address climate change in BC.

Since the province seems to be fixated with creating a LNG industry which will dwarf all other GHG emissions in this province, it will be interesting to see if the new “Climate Leadership Plan” will actually do anything meaningful.

Right now, the province has released a decision guide and is looking for feedback via an online survey which will be up until August 17th. The decision guide talks very generally on how we live, travel, work, and what we value, and how that impacts climate change. The guide also looks at some tools that can be used to reduce GHG emissions and adapt to climate change. The online survey is looking to gauge how people feel about ways to reduce GHG and adapted to climate change.

I completed the survey in about 10 minutes. If you have time, I suggest that you complete the survey too.

A draft “Climate Leadership Plan” is suppose to be released around Christmas. There will be a chance for public feedback on the draft plan. The final plan is expected to be released in March 2016.

Tuesday, August 11, 2015

After reading this report, you’ll think twice about going over the Pattullo Bridge

A few weekends ago, I was walking on Columbia Street with some friends. We were walking from Downtown New Westminster to the Brewery District near Sapperton SkyTrain station. We walked underneath the Pattullo Bridge.

Now, it is generally known that the Pattullo Bridge is in rough shape, but what I saw was shocking. There was netting installing under the bridge to prevent chunks of the bridge from hitting people walking, cycling, or driving along Columbia. I wish I took a picture. Clearly TransLink has been monitoring the condition of the bridge because where there was sections of cracked concrete, or exposed rebar, there was orange spray paint. I am not exaggeration when I say that the section of bridge deck above Columbia Street was covered in spray paint. Beyond the cracks and sections of missing concrete, the bridge is also rusting away.

Sometimes when governments say something needs to be replaced due to age, there is an ulterior motive. For example, both the old Port Mann Bridge and the current Massey Tunnel were/are in a state of good repair, but one was replaced to build a massive toll highway and the other is being replaced to enable better access for Port Metro Vancouver.

The Pattullo Bridge needs to be replaced because it is falling into the Fraser River, but how bad is it in need of replacement?

I found a June 17, 2014 report on the bridge deep within TransLink’s website. The bridge has the following overall issues:

  • susceptibility to collapse from a moderate earthquake;
  • river scour threat to the stability of the bridge foundations;
  • a delaminating bridge deck [concrete and rebar seperating;
  • concrete and steel structural elements reaching the end of their functional life;
  • spalling concrete from the underside of the deck and from the piers creating a falling debris hazard;
  • narrow travel lanes;
  • no median barrier;
  • the bridge has not been designed to withstand a vessel impact;
  • poor pedestrian/cycling facilities, including an absence of suicide prevention measures.

Overall it is in rough shape, but some of the details really make you think twice about using the bridge. For example, the report states:

The inspected deck areas varied between fair and poor, with considerable areas of delamination (disconnection of the concrete from the steel), localized patching, and surface spalls. While deck patching and repaving have been undertaken in recent years, these repairs are considered viable in the short-term only. It is expected that the corrosion and its related damage will occur at an increasing rate, requiring bridge maintenance closures to occur at increasing frequency and for longer durations.

There have been several instances during the current and previous deck repair programs where removal of the deteriorated concrete from the top surface of the deck resulted in small holes through the deck, usually less than approximately 100 mm in diameter. The frequency and size of these full-thickness damage events should be expected to increase over time. At this time, the possibility of a localized full thickness deck failure (a small or large but deep pothole that could cause damage to vehicles) cannot be ruled out.

With this is mind, it is no surprise that TransLink is planning massive closures for the bridge to complete a $100 million repair job in 2016. Of course, there will still be fundamental issues with the bridge. Even with the repairs, the bridge’s life will only be extended by about decade. The repairs will only “reduce the magnitude of the prevailing risks” of having the Pattullo Bridge remain in service.

It is interesting that the provincial government is committed to replacing the safe Massey Tunnel, but expects local government to come up with the majority of the funds to replace the Pattullo Bridge which is crumbling into the Fraser River.